The works consisted of the fitout of an existing grey box on level 4 of the Beacon Hospital into a mix ot 2 bed and 3 bed wards, isolation room and ancillary accomodtaion.
These works were be carried out within a live hospital environment. The floor was directly over a live ICU floor.
Key Facts | ||||||||||
|